亚洲AV无码成人片在线观看|亚洲高清在线不卡|精品一区二区黄片|国产精品一级乱色视频

Chinese English
Home > News > News
News
Chairman Yang Dongqiang visited Wuxi Hequan project department for inspection and guidance
News | 2022-3-26 | Views: 600

On the morning of March 26, chairman and general manager Yang Dongqiang visited Wuxi Hequan project department to inspect and guide the work. Accompanied by Zhou Yuncheng, deputy general manager of operation, Li Yifei, assistant general manager and project site manager, they walked into the project construction site to fully understand the construction of each unit and system of the project. At each place, stop to check and inquire from time to time, fully understand the details of project material supply, quality supervision, safety control, subcontracting unit management and personnel organization, and advise relevant precautions.

After the field visit, the chairman and general manager Yang Dongqiang organized and held a project promotion meeting at the project site. At the meeting, the person in charge of each discipline made a detailed report on the construction progress, material arrival, personnel organization, quality control and existing problems around the construction content of the discipline; After listening to the report, chairman and general manager Yang Dongqiang discussed the main existing problems and put forward specific requirements for the next stage of work to ensure the high quality, high standard and on-time delivery of the project.

Yang Dongqiang, chairman and general manager, fully affirmed the phased achievements made by the project team in working hard day and night to catch up with the progress and working overtime, and thanked all members of the project department on behalf of the company! Focusing on the project delivery target on schedule and facing the main existing problems, after full discussion, chairman and general manager Yang Dongqiang pointed out the direction for him and asked relevant functional departments to work on site, so as to solve the problems in a timely, effective and thorough manner and provide strong organization and resource guarantee for ensuring the construction progress of the project.

The owner's demand is the direction of our efforts. Chairman and general manager Yang Dongqiang encouraged all members of the project department to cherish this valuable work experience in the project, not only to do a good job in a project, but also to make a group of friends, so as to continuously improve and improve themselves; Facing the problems in work, we should not only overcome the fear of difficulties, but also be proactive and optimistic, and improve our ability to solve problems in continuous summary and learning; In the face of urgent construction period and heavy construction tasks, we should pay more attention to work planning, abide by rules and procedures, properly handle the relationship between work and life, strengthen physical exercise, and achieve the objectives of quality and progress while ensuring safety.

Since its commencement in late September 2021, Wuxi Hequan project department has a tight construction period and heavy tasks. At the same time, it is faced with great pressure and difficulties in material supply, personnel deployment and organization of epidemic prevention and control. The project department has overcome many difficulties, and the project construction has made phased achievements, which has been affirmed by the owner. The visit and guidance of chairman and general manager Yang Dongqiang strengthened the confidence to achieve perfect delivery on schedule!

(Wuxi STA Project Department)


News

©Copyright Jiangsu Xinda Construction Engineering Co., Ltd. 2005-2020. All Rights Reserved.